§ 114.08. PERMIT REQUIRED.
Latest version.
- (A) Before moving any building out of, into, within, or through the City, except wholly upon private property, a permit shall be obtained by the building mover and owner of the building, by making application upon a form furnished by the Building Department for filing with the City Clerk. The application shall be signed by the building mover and owner of the building and include the following information:(1) A description of the building and the address and legal description of its current location;(2) The location of the lot to which the building is to be moved including its address and legal description;(3) A detailed description or map of the proposed route over which the building is to be moved;(4) The date and approximate time that the building will be moved, along with the length of time required for moving;(5) Owner of the building;(6) A certificate from the County Treasurer showing that all taxes and special assessments then due against the building and lot on which it stands have been paid;(7) How and by whom the building is to be moved;(8) Use of building at new site;(9) A photograph of the building;(10) Such additional information as may be requested by the City; and(11) Request to exceed height limitation, if applicable.(B) In addition, the following documents must accompany the application:(1) A signed statement from all utility companies and also from any railroad or other utility company that has lines crossing the proposed route acknowledging that they have been notified of the move and that the move meets with their approval. If the move will interfere with the utility company, the signed statement must contain the nature and duration of the interference and the portions of the City to be affected.(2) Certification from the Police Chief or designee that the Chief or designee has reviewed the date, time, and route along with any recommendations for the move;(3) Verification that the Building Official has inspected the building to determine the feasibility of moving it and compliance with this chapter and the Building Code once relocated, and that following such inspection the Building Official has approved the building for the move subject to a list of what, if any, changes, alterations or corrections need to be made to the building once relocated. The building permit obtained for the relocated building shall require the list of changes, alterations or corrections to be complied with;(4) Verification that the Building Official has ascertained that the size, condition, proposed use and proposed construction alterations are in accordance with the zoning regulations of the City;(5) Verification that a building permit has been applied for and approved for the relocated building;(6) Proof that the insurance required under this chapter has been obtained; and(C) The application shall be submitted to the City Clerk along with the required fee at least 21 calendar days before the Planning Commission meeting at which the application will be considered. The City Clerk shall then schedule the application for public hearings before the Planning Commission and City Council. The Building Official will report on the application for a moving permit to the Planning Commission, which shall investigate the matter. The Planning Commission, after the ten days notice and publication requirements of § 114.12, have been complied with, shall hold a public hearing and following the public hearing, shall make a recommendation to the City Council that the permit be granted or denied. The City Council, after the ten-day notice and publication requirements of § 114.12 have been complied with, shall hold a public hearing, and following such public hearing shall grant or deny the permit.('63 Code, § 5-9-5) (Ord. 01-28, passed 5-7-01; Am. Ord. 17-03, passed 1-16-17) Penalty, see § 114.99