§ 150.025. APPLICATION FOR PERMIT.  


Latest version.
  • All applications for permits for installations must be made at the Building Department office, and each application must have the name of the owner or contractor together with the owner or contractor’s correct address, classification of wiring and the name of the electrician who is to do the installing. The application must be filed before any installations are made, and no installation shall be made until after a permit has been granted.
    (‘63 Code, § 4-2-13) (Ord. 2315, passed 4-18-73) Penalty, see § 150.999